Fire Suppression: New/System Test
6.29.26 [Jeremy]: Lauren and Bob are working to implement into future designs where possible
6.29.26 [Jeremy]: Lauren and Bob are working to implement into future designs where possible
6.29.26 [Jeremy]: Continues to be pending input from Development (Lisa); believe there are potential savings and reduced downtime (limited investment w/potential upside); no retro - if aligned, would ultimately move to Construction as the owner
3.13.26 [Jeremy]: Pending input from Development (Lisa); believe there are potential savings and reduced downtime; if aligned, would ultimately move to Construction as the owner
10.21.25 (Jeremy):Researching for new restaurants only, can't be retrofittedWorking with construction on incorporating in design No cost to this - will just be a different ansul installed in the new NRO's but we will not be retrofitting 2.6.26 (Jeremy): MEP needs to vet spec, This would be research in 2026 as it would have to be built into the building design, No retros
10.21.25 (Jeremy):Researching for new restaurants only, can't be retrofittedWorking with construction on incorporating in design No cost to this - will just be a different ansul installed in the new NRO's but we will not be retrofitting 2.6.26 (Jeremy): MEP needs to vet spec, This would be research in 2026 as it would have to be built into the building design, No retros
Researching for new restaurants only, can't be retrofittedWorking with construction on incorporating in design No cost to this - will just be a different ansul installed in the new NRO's but we will not be retrofitting
Needs cross-functional support/input from Development (Lisa)